Officials open extension of Lexington’s first recreational rail trail


Mayor Jim Gray gets help from Maya Wijesiri, 3, and her mother, Wendy Wijesiri, in cutting the ribbon opening the second phase of the Brighton East Rail Rail.  Photo by Tom Eblen

Lexington officials Monday opened the first extension of the the Brighton East Trail, Fayette County’s first rail trail.

The 12-foot-wide recreational trail had run a mile from Bryant Road to Pleasant Ridge Drive, through the new residential neighborhoods around Hamburg. The one-mile extension takes the trail along an old railroad bed into the country as far as Walnut Grove Road.

The original trail, completed in 2007, has been so popular that area residents wanted the extension, said district Council member Kevin Stinnett. As Stinnett, Mayor Jim Gray and Council member Harry Clarke prepared to cut the ribbon on the new section, people from the area were already using it for running, cycling and taking children for stroller rides.

Eventually, city officials hope to extend the trail out to the Clark County line and in to connect with the Liberty Park Trail.

The trail extension was funded by $450,000 in federal, state and local money. But key to the project was an easement donation, 100 feet wide and one-mile long, by property owner Marion Clark. She made the donation because she realized what a good amenity the trail would be to future development of her property, said Keith Lovan, the city engineer who heads local trail projects.

The wide easement allowed the city to preserve existing trees from the old rail line, as well as plant more trees to keep the trail pleasantly shaded in hot weather.

Many other states have developed extensive trail systems using abandoned rail lines. But that has been difficult in Kentucky, because abandoned rail lines were often acquired by adjacent property owners.

Parking for the new trail is at Pleasant Ridge Park, 1350 Pleasant Ridge Drive.

Comments are closed.